The pass rate is 99% for CDCS exam materials, and most candidates can pass the exam by using CDCS questions and answers of us. If you choose us, we can ensure you that you can pass the exam just one time. We will give you refund if you fail to pass the exam, you don’t need to worry that your money will be wasted. We offer you free demo to have a try before buying CDCS Exam Dumps, so that you can have a better understanding of what will buy. We have online and offline chat service stuff, and if you have any questions about CDCS exam dumps, you can consult us.
Topic | Details |
---|---|
Topic 1 |
|
Topic 2 |
|
Topic 3 |
|
A certificate means a lot for people who want to enter a better company and have a satisfactory salary. CDCS exam dumps of us will help you to get a certificate as well as improve your ability in the processing of learning. CDCS study materials of us are high-quality and accurate. We also pass guarantee and money back guarantee if you fail to pass the exam. We offer you free demo to have a try. If you have any questions about the CDCS Exam Dumps, just contact us.
NEW QUESTION # 36
A computer room needs to be fitted out with a gas-based fire suppression system. The computer room will be a high-density data center with about 30% of the racks being closed circuit cooling blade-center racks.
Should the supplier of the fire suppression system be informed on the design of the racks?
Answer: A
Explanation:
The design and configuration of racks, particularly high-density and closed-circuit cooling racks, directly impact the fire suppression system design. Closed-circuit cooling racks, like blade-center racks, can affect airflow and potentially trap heat, influencing how fire suppression agents are distributed within the space. Therefore, it is essential to inform the fire suppression system supplier about the rack design to ensure effective coverage and proper agent distribution.
Detailed Explanation:
High-density racks can change how smoke and heat travel, which in turn affects fire detection and suppression. Closed racks with built-in cooling can isolate airflow, requiring adjustments in fire suppression design to ensure that suppression agents reach all necessary areas, including within enclosed spaces. The supplier may need to account for these factors to ensure proper protection coverage.
EPI Data Center Specialist References:
The EPI Data Center Specialist training underscores that fire suppression systems must be tailored to the specific environmental characteristics of the data center. The design of racks, particularly high-density configurations, should always be considered to ensure that suppression agents can effectively control a fire, even in contained rack spaces.
NEW QUESTION # 37
You have three UPS systems connected in parallel. The UPS systems have an imbalance in the load sharing of approximately 20%.
What should you recommend?
Answer: C
Explanation:
An imbalance in load sharing between UPS systems connected in parallel can often result from unequal cable lengths to the common busbar. If the cabling from each UPS to the busbar varies significantly in length, it can lead to differences in impedance, resulting in uneven load distribution. Ensuring that cable lengths are consistent helps to balance the load sharing across the UPS systems.
Detailed Explanation:
Parallel UPS systems rely on uniform impedance to share loads evenly. Differences in cable lengths cause variations in resistance, leading to one or more UPS units carrying a disproportionate share of the load. Standardizing cable lengths ensures equal impedance, which promotes balanced load sharing and prevents one UPS from being overburdened, thus maintaining overall system reliability.
EPI Data Center Specialist References:
EPI guidelines recommend checking cable lengths when load imbalances occur in parallel UPS configurations. Ensuring equal lengths is a common method to resolve impedance issues that affect load distribution, which is critical for the stable operation of redundant power systems.
NEW QUESTION # 38
What is the minimum requirement for the power feeds to the building for a Rated-3 data center based on the ANSI/TIA-942 standard?
Answer: B
Explanation:
The minimum requirement for power feeds to a Rated-3 data center according to ANSI/TIA-942 is to have two independent power feeds, which can come from two different substations provided by the same power company. This ensures redundancy and concurrent maintainability, as each feed can support the load independently during maintenance or failure of the other.
Detailed Explanation:
The separation by two substations ensures resilience in case of a localized outage or substation maintenance, aligning with Rated-3 requirements for uninterrupted operation. ANSI/TIA-942 permits these feeds from a single utility provider as long as they are supplied from distinct substations.
EPI Data Center Specialist References:
EPI underscores the importance of dual power feeds from separate substations for Rated-3 facilities, highlighting that the ability to draw from different substations aligns with redundancy requirements for high availability.
NEW QUESTION # 39
A new network storage device in a non-standard size rack of approximately 600 kg/1,300 lbs is going to be installed in the data center.
Are new floor loading calculations required?
Answer: C
Explanation:
For heavy equipment, such as a network storage device weighing approximately 600 kg/1,300 lbs, new floor loading calculations are indeed required, particularly since the rack is non-standard. A structural engineer, approved by the building owner, should conduct these calculations to ensure the floor can safely support the new load without risking structural integrity.
Detailed Explanation:
Data centers are designed with specific floor load ratings, which are determined during the design phase based on anticipated equipment. When adding or replacing equipment that is significantly heavy or non-standard, reassessing the floor's capacity is essential to avoid overloading. A structural engineer has the expertise to verify if the existing floor can accommodate the weight and, if not, can recommend reinforcement measures.
This step ensures compliance with safety standards and helps prevent damage to the infrastructure, which could lead to costly repairs or even catastrophic failure in extreme cases.
EPI Data Center Specialist References:
EPI Data Center Specialist training advises that any changes in the data center load, particularly involving non-standard and heavy equipment, warrant a structural assessment. Ensuring compliance with floor load capacity is a critical safety and operational concern, as underscoring data center infrastructure reliability and safety is a priority in EPI's best practices.
NEW QUESTION # 40
Three data centers are benchmarked on facilities energy efficiency.
Data center A has achieved a PUE of 2.45.
Data center B has achieved a PUE of 1.20.
Data center C has achieved a PUE of 1.90.
Which of the data centers is operating at the highest facility efficiency?
Answer: C
Explanation:
A Power Usage Effectiveness (PUE) of 1.20 (achieved by Data Center B) indicates the highest facility efficiency among the three data centers. A lower PUE value signifies better energy efficiency, as it means that a greater proportion of the total energy consumed is used directly for IT equipment rather than for cooling, lighting, or other facility needs.
Detailed Explanation:
PUE is calculated as the ratio of total facility energy to IT equipment energy. A PUE close to 1.0 suggests that almost all the energy is dedicated to computing processes, with minimal overhead. With PUE values of 2.45, 1.20, and 1.90, Data Center B (1.20) operates most efficiently by devoting a higher percentage of its total energy to IT equipment.
EPI Data Center Specialist References:
The EPI curriculum emphasizes PUE as a key metric for data center efficiency, with lower values representing better performance. Achieving a PUE near 1.0 aligns with industry best practices for energy-efficient data center design and operation.
NEW QUESTION # 41
......
Our CDCS test prep is renowned for free renewal in the whole year. As you have experienced various kinds of exams, you must have realized that renewal is invaluable to CDCS study materials, especially to such important CDCS exams. And there is no doubt that being acquainted with the latest trend of exams will, to a considerable extent, act as a driving force for you to pass the exams and realize your dream of living a totally different life. So if you do want to achieve your dream, buy our CDCS practice materials.
Customized CDCS Lab Simulation: https://www.pass4guide.com/CDCS-exam-guide-torrent.html
This is a demo store for testing purposes — no orders shall be fulfilled. Dismiss